Hydraulic, Electrical, Cockpit, and Airframe Progress

A lot of progress has been made toward completing the hydraulic system.  Mike is nearing completion of the wing root hydraulics on both sides.  The hydraulic system on this plane is going to be spectacular.  Steady progress has been made in the cockpit as well.  Brad has been busy wiring the cockpit.  The electrical system is far enough along that we have been applying external power to check operation of some instruments.  Alan has just finished fabricating and installing both trailing edge top skins for the wing roots.  The flap gap seal mechanism was completely overhauled by Alan.  After a thorough teardown and inspection, our oil tank has been finished and installed by Tom. 

click on the thumbnail image to see larger image and description

           

           

   

Back